New flat handover from a developer with an inspector

Illustration: New flat handover from a developer with an inspector
Technical handover of a new flat with an inspector: what to check, how to record defects in the report and how long the developer has to respond.
How often
once, before signing the handover report
Legal basis
Act of 20 May 2021 on the protection of buyers of residential units and houses (the so-called developer act)
Who does it
a building inspector or an experienced handover specialist

Updated: · DomPrzegląd editorial team

The handover is the moment when defects are easiest to enforce. Everything you write in the handover report must be considered by the developer: they have 14 days to respond and, as a rule, 30 days to remove accepted defects.

What the inspector checks

  • plumb, level and flatness of walls, floors and ceilings,
  • windows, doors, sills and their adjustment,
  • plaster, screeds and moisture in partitions,
  • electrical, water, heating and ventilation installations,
  • floor area and layout compared with the contract.

Bring the contract, the floor plan and the information prospectus. Describe each defect precisely and attach photos.

After the handover

Save the report in the House logbook. The statutory warranty for defects lasts 5 years, and the logbook will remind you before it ends.

What to prepare

  • the developer contract and information prospectus
  • floor plan with dimensions
  • a camera or phone for photos of defects

Inspection in your voivodeship

Frequently asked questions

Can I accept the flat if there are defects?

Yes. Record them in the handover report. Signing a report with defects does not take away your right to have them fixed.

What if the developer refuses to fix a defect?

A refusal must be justified. It then helps to have the opinion of the inspector who attended the handover.